{"id":250,"date":"2024-05-13T08:12:21","date_gmt":"2024-05-13T08:12:21","guid":{"rendered":"https:\/\/www.cnvrs8.com\/demo\/amplussolar\/blog\/?p=250"},"modified":"2024-11-14T10:40:18","modified_gmt":"2024-11-14T10:40:18","slug":"complete-details-about-solar-system-price-and-subsidy-in-haryana","status":"publish","type":"post","link":"https:\/\/www.cnvrs8.com\/demo\/amplussolar\/blog\/complete-details-about-solar-system-price-and-subsidy-in-haryana\/","title":{"rendered":"Complete Details About Solar System Price and Subsidy in Haryana"},"content":{"rendered":"\n<p>To save natural resources and the climate, Solar Photovoltaic Technology is gaining momentum as a powerful alternative for generating electricity. Solar energy plants provide a reliable supply of zero-cost electricity for a span of 25 years. It\u2019s a viable solution for the commercial and industrial sectors as well as individual households and housing societies.<\/p>\n\n\n\n<p>Solar energy can help you meet a large part of electricity demand and reduce your monthly expenses associated with using conventional energy sources. Many households, farmhouses, and housing societies are able to cut up to 90% of their utility costs. These financial gains also help you earn back your initial solar investment in just 6 to 8 years.&nbsp;Solar system prices in Haryana&nbsp;are more affordable than ever in the Phase II of the Grid-Connected Rooftop Solar Program. Homeowners can take advantage of&nbsp;solar panel subsidy in Haryana&nbsp;and reduce their upfront solar investment.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Solar Panel System Subsidy in Haryana<\/h2>\n\n\n\n<p>A&nbsp;3kW solar system price in Haryana with subsidy&nbsp;makes great sense for most homes looking for a low-cost, reliable energy source. The government of India understands this need of residential consumers and has subsidized the&nbsp;500-watt solar panel price in Haryana. The Ministry of New and Renewable Energy (MNRE) is offering fixed Central Financial Assistance (CFA)\/Solar Subsidy Support across different system capacity slabs.<\/p>\n\n\n\n<p>Whether it\u2019s a basic&nbsp;3kW solar panel price in Haryana&nbsp;or a higher capacity system of 10kW or above, residential owners or housing societies can waive some of their upfront solar costs.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>Rooftop Solar System Capacity<\/strong><\/td><td><strong>Applicable Subsidy (\u20b9)<\/strong><\/td><\/tr><tr><td>Up to 3 kW<\/td><td>18,000\/kW<\/td><\/tr><tr><td>Above 3 kW and up to 10 kW<\/td><td>9,000\/kW*<\/td><\/tr><tr><td>Above 10 kW<\/td><td>1,17,000**<\/td><\/tr><tr><td>Resident Welfare Associations (RWA) \/ Group Housing Societies (GHS)<\/td><td>Rs. 9,000\/- per kWFor common facilities up to 500 kWp @ 10 kWp per house, with the upper limit being inclusive of individual rooftop plants already installed by individual residents in that GHS\/RWA at the time of installation of RTS for common activity.<\/td><\/tr><tr><td colspan=\"2\"><strong>Note:<\/strong>&nbsp;*\u20b918,000\/kW for the first 3 kW and \u20b99,000\/kW for the rest of the capacity up to 10 kW.**The subsidy amount is fixed for rooftop solar systems above 10 kW capacity.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><strong>Note:<\/strong>&nbsp;Your CFA\/subsidy claim approval depends on the successful inspection and commissioning of your rooftop solar energy plant. The process also involves pairing a new metering system with your plant. The final amount of&nbsp;solar subsidy in Haryana&nbsp;is calculated according to your total system size which has been approved by your local DISCOM authority or recommended by your empanelled solar vendor, whichever is lower.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Solar System Price in Haryana<\/h2>\n\n\n\n<p>You probably pay a much higher cost for using grid-supplied electricity in your region. Despite the high&nbsp;solar panel price in Haryana&nbsp;that involves material and installation costs, solar energy actually shows a much lower cost per watt of solar electricity produced than conventional sources. The government of India is encouraging the use of home solar energy systems by offering&nbsp;solar panel subsidy in Haryana&nbsp;and all over India. The solar subsidy has further reduced the upfront solar investment and improved the economies of solar power.<\/p>\n\n\n\n<p>It can be a little complicated to determine the cost of setting up the entire home solar power system. Your location and energy demand determine the most suitable size and type of solar system. If you want to set up solar panels without losing valuable acres, a pergola-style solar module mount might be suitable. All such decisions influence your total&nbsp;solar system price in Haryana.&nbsp;<\/p>\n\n\n\n<p>Below you can find a rough estimate of&nbsp;1kW to 10kW solar panel price in Haryana. For a more accurate estimate of your specific situation and energy goals, it\u2019s advised that you talk to an experienced solar company. Solar companies conduct on-site assessments and provide customized quotes.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>Solar System Size<\/strong><\/td><td><strong>Price Range (Estimated)<\/strong><\/td><\/tr><tr><td><a href=\"https:\/\/amplussolar.com\/blogs\/1kw-solar-system-price-in-india-with-subsidy\">1kW Solar System<\/a><\/td><td>Rs. 75,000 \u2013 85,000<\/td><\/tr><tr><td><a href=\"https:\/\/amplussolar.com\/blogs\/2kw-solar-system-price-in-india-with-subsidy\">2kW Solar System<\/a><\/td><td>Rs. 1,50,000 \u2013 1,70,000<\/td><\/tr><tr><td><a href=\"https:\/\/amplussolar.com\/blogs\/3kw-solar-panel-system-price-in-india-with-subsidy\">3kW Solar System<\/a><\/td><td>Rs. 1,89,000 \u2013 2,15,000<\/td><\/tr><tr><td>4kW Solar System<\/td><td>Rs. 2,52,000 \u2013 2,85,600<\/td><\/tr><tr><td><a href=\"https:\/\/amplussolar.com\/blogs\/5kw-solar-system-price-in-india-with-subsidy\">5kW Solar System<\/a><\/td><td>Rs. 3,15,000 \u2013 3,57,000<\/td><\/tr><tr><td><a href=\"https:\/\/amplussolar.com\/blogs\/10kw-solar-system-price-in-india-with-subsidy-2023\">10kW Solar System<\/a><\/td><td>Rs. 5,31,000 \u2013 6,07,000<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Solar System Price in Haryana with Subsidy<\/h2>\n\n\n\n<p>The subsidy structure under the simplified scheme offers a fixed&nbsp;solar system subsidy in Haryana&nbsp;and all of India on solar energy plants installed by residential consumers. The CFA (Central Financial Assistance) is available for residential properties&nbsp;and housing societies on solar panel capacities from 1kW to 500kWp systems. The&nbsp;price of a 5kW solar system in Haryana with subsidy&nbsp;and of other system capacities are calculated below:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>Solar System Size<\/strong><\/td><td><strong>Estimated Price Range<\/strong><\/td><td><strong>Subsidy Applicable<\/strong><\/td><td><strong>Prices After Subsidy<\/strong><\/td><\/tr><tr><td><a href=\"https:\/\/amplussolar.com\/blogs\/1kw-solar-system-price-in-india-with-subsidy\"><strong>1kW Solar System<\/strong><\/a><\/td><td>Rs. 75,000 \u2013 Rs. 85,000<\/td><td>Rs. 18,000<\/td><td>Rs. 57,000 \u2013 Rs. 67,000<\/td><\/tr><tr><td><a href=\"https:\/\/amplussolar.com\/blogs\/2kw-solar-system-price-in-india-with-subsidy\"><strong>2kW Solar System<\/strong><\/a><\/td><td>Rs. 1,50,000 \u2013 Rs. 1,70,000<\/td><td>Rs. 18,000 x 2 = Rs. 36,000<\/td><td>Rs. 1,14,000 \u2013 Rs. 1,34,000<\/td><\/tr><tr><td><a href=\"https:\/\/amplussolar.com\/blogs\/3kw-solar-panel-system-price-in-india-with-subsidy\"><strong>3kW Solar System<\/strong><\/a><\/td><td>Rs. 1,89,000 \u2013 Rs. 2,15,000<\/td><td>Rs. 18,000 x 3 = Rs. 54,000<\/td><td>Rs. 1,35,000 \u2013 Rs. 1,61,000<\/td><\/tr><tr><td><strong>4kW Solar System<\/strong><\/td><td>Rs. 2,52,000 \u2013 Rs. 2,85,600<\/td><td>Rs. 18,000 x 3 + Rs. 9,000 x 1 = 63,000<\/td><td>Rs. 1,89,000 \u2013 Rs. 2,22,600<\/td><\/tr><tr><td><a href=\"https:\/\/amplussolar.com\/blogs\/5kw-solar-system-price-in-india-with-subsidy\"><strong>5kW Solar System<\/strong><\/a><\/td><td>Rs. 3,15,000 \u2013 Rs. 3,57,000<\/td><td>Rs. 18,000 x 3 + Rs. 9,000 x 2 = Rs. 72,000<\/td><td>Rs. 2,43,000 \u2013 Rs. 2,85,000<\/td><\/tr><tr><td><a href=\"https:\/\/amplussolar.com\/blogs\/10kw-solar-system-price-in-india-with-subsidy\"><strong>10kW Solar System<\/strong><\/a><\/td><td>Rs. 5,31,000 \u2013 Rs. 6,07,000<\/td><td>Rs.&nbsp;1,17,000<\/td><td>Rs. 4,14,000 \u2013 Rs. 4,90,000<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Steps to Apply for a Subsidy in Haryana<\/h2>\n\n\n\n<p>If you want to set up your home solar energy system through the simplified procedure of the government solar subsidy program, you need to visit the official website called the&nbsp;<a href=\"https:\/\/solarrooftop.gov.in\/\">National Portal for Rooftop Solar<\/a>. You can apply for&nbsp;solar subsidy in Haryana&nbsp;online by following these simple steps:&nbsp;<\/p>\n\n\n\n<p><strong>Step 1 \u2013 Registration<\/strong><\/p>\n\n\n\n<p>As a new solar energy consumer, you need to first register on the&nbsp;<a href=\"https:\/\/solarrooftop.gov.in\/\">National Portal for Rooftop Solar<\/a>. Select your local DISCOM company and provide your Electricity connection number \/ Consumer number and other details as asked in the process.<\/p>\n\n\n\n<p><strong>Step 2 \u2013 Apply for Rooftop Solar<\/strong><\/p>\n\n\n\n<p>Now you can log into your account and initiate the subsidy process by submitting your application online. Provide further details like address, name on the electricity bill, the capacity of proposed RTS plant, and details of an existing solar system (if any) along with a copy of your latest electricity bill.<\/p>\n\n\n\n<p><strong>Step 3 \u2013 Technical Feasibility Approval\/TFR<\/strong><\/p>\n\n\n\n<p>Your online application is transferred to your state DISCOM for review and technical feasibility approval. Any inaccuracy found in your application can result in the dismissal of the application. For this reason, an applicant is advised to initiate the solar panel installation only after receiving the technical feasibility (TFR) approval.<\/p>\n\n\n\n<p><strong>Selection of Vendor and Plant Installation<\/strong><\/p>\n\n\n\n<p>Having received a favourable TFR status, you can finalize a solar company to complete the installation work. The solar subsidy guidelines issued by the MNRE mandate that all applicants hire from the ALMM list of empanelled vendors. These vendors are trained to complete all installations according to the minimum technical specifications and standards required under the subsidy guidelines. Also, only grid-tied solar systems composed of made-in-India solar components are eligible for subsidy on solar panel systems in Haryana and all over India.<\/p>\n\n\n\n<p>Also, sign the ALMM declaration form with your vendor at the start of the project. It\u2019s a model agreement prescribed by MNRE that protects consumers\u2019 interests.<\/p>\n\n\n\n<p><strong>Step 4 \u2013 Submit Installation Details<\/strong><\/p>\n\n\n\n<p>Once your&nbsp;solar power plant in Haryana&nbsp;has been installed, upload all the documents on the National Portal. A photo of the applicant alongside the RTS system is also required. After this step, a visit from government officials is scheduled for the inspection and net metering provision of your solar plant.<\/p>\n\n\n\n<p><strong>Step 5 \u2013 Inspection by DISCOM<\/strong><\/p>\n\n\n\n<p>A field officer from your state DISCOM performs a thorough inspection of your rooftop solar energy plant and ensures that the installation is done as per the MNRE\u2019s technical specifications and standards. Upon successful inspection, a net meter is integrated into your system.<\/p>\n\n\n\n<p><strong>Step 6 \u2013 Project Commissioning Status<\/strong><\/p>\n\n\n\n<p>If your system conforms to the MNRE\u2019s subsidy guidelines, the DISCOM authority approves your application. A commission certificate is generated which can be accessed through the applicant\u2019s account on the National Portal.<\/p>\n\n\n\n<p><strong>Step 7 \u2013 Subsidy\/CFA Request<\/strong><\/p>\n\n\n\n<p>You should be able to see your approved subsidy amount on the portal. The last step requires you to provide your bank details and a copy of the cancelled cheque and raise a subsidy\/CFA claim request online. The subsidy amount is transferred directly into the applicant\u2019s bank account within 30 days of installation.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Benefits of Solar Panel Subsidy in Haryana<\/h2>\n\n\n\n<p>Some of the significant benefits of availing a&nbsp;solar subsidy in Haryana&nbsp;include \u2013<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>It can encourage more homes to switch to solar systems and reduce the use of non-renewable energy resources for power generation.<\/li>\n\n\n\n<li>Customers can enjoy 5 years of performance warranty from the empanelled vendor if they install the solar system under the subsidy scheme.<\/li>\n\n\n\n<li>Customers can earn solar credits by selling off their surplus energy to the grid under the net metering regulations.\u00a0<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Process for Installing Solar System in Haryana<\/h2>\n\n\n\n<p>Switching to solar is a relatively easy process. With the right solar vendor, you can find the best prices for a&nbsp;2kW solar panel system in Haryana&nbsp;or any system size your home needs.<\/p>\n\n\n\n<p><strong>Step 1 \u2013 Site Survey<\/strong><\/p>\n\n\n\n<p>An experienced solar installation team visits your site to review, measure, and finalize your present and future energy needs. Accordingly, they help you decide what type and size of solar system is most suitable to power your property.<\/p>\n\n\n\n<p><strong>Step 2 \u2013 Design Review<\/strong><\/p>\n\n\n\n<p>Depending on the finalized details and your unique solar ownership goals, the solar experts prepare an initial plan. After the necessary follow-up with the customer, the required changes are made. A design is only finalized when the customer is happy with the promised results.<\/p>\n\n\n\n<p><strong>Step 3 \u2013 Permitting and Installation<\/strong><\/p>\n\n\n\n<p>Your registered solar vendor is trained to handle all the paperwork and secures the necessary permits. The installation is as per the MNRE\u2019s subsidy guidelines. The final result is an upgraded and empowered roof space. On average, the installation is done within a day or two, although higher capacity systems often have a longer turnaround time.<\/p>\n\n\n\n<p><strong>Step 4 \u2013 Inspection and Utility Connection<\/strong><\/p>\n\n\n\n<p>Your empanelled solar vendor is required to assist the field officers in the inspection of your installed RTS plant. Also, the vendor is obligated to work with your utility company and connect your system to the grid. For this reason, they ensure the proper installation of the net metering mechanism.&nbsp;<\/p>\n\n\n\n<p><strong>Step 5 \u2013 Power On<\/strong><\/p>\n\n\n\n<p>Your solar panels start generating zero-cost solar energy from the first day of installation. Now you can trust the sun to power your home or business for you.<\/p>\n\n\n\n<p><strong>Note:<\/strong>&nbsp;There is a minimum space requirement of 10 Sq.mt.\/kWp to be eligible for a solar system installation. Also, the&nbsp;solar subsidy scheme in Haryana&nbsp;applies only to grid-connected solar systems and solar panels made exclusively in India.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What is Net Metering?<\/h2>\n\n\n\n<p>The net metering mechanism allows homeowners to monetize the surplus electricity generated by solar panel systems instead of letting it go to waste. Users can receive credits for sending unused power to the connected grid. The credit is applicable at a retail rate as defined by your local DISCOM company.&nbsp;<\/p>\n\n\n\n<p>Homeowners can use solar credits to purchase grid power to meet their additional electricity needs, beyond what they can fulfil through on-site solar energy output. If by the end of the year, your bill reflects a positive solar credit balance, the utility company pays out the same in cash to you.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to Apply for a Net Meter in Haryana?<\/h2>\n\n\n\n<p>To follow a simple net-metering process in Haryana without delays, follow these steps \u2013<\/p>\n\n\n\n<p><strong>Step 1:<\/strong>&nbsp;Visit the official DHBVN website:&nbsp;<strong><a href=\"https:\/\/www.dhbvn.org.in\/web\/portal\/home\">https:\/\/www.dhbvn.org.in\/web\/portal\/home<\/a><\/strong><\/p>\n\n\n\n<p><strong>Step 2:<\/strong>&nbsp;On the home page, click on Solar Connection.<\/p>\n\n\n\n<p><strong>Step 3:<\/strong>&nbsp;Next, click on Apply. You will be redirected to the application page, where you will be required to enter your personal and postal details.<\/p>\n\n\n\n<p><strong>Step 4:<\/strong>&nbsp;After submitting the above details, the documentation process will begin. Upload the necessary documents like \u2013<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Aadhar card<\/li>\n\n\n\n<li>Electricity bill<\/li>\n\n\n\n<li>Photographs<\/li>\n\n\n\n<li>Applicant\u2019s full name signature<\/li>\n<\/ul>\n\n\n\n<p>Ensure that the applicant\u2019s name and the name of the property registry and electricity bill are the same to avoid application rejections.<\/p>\n\n\n\n<p><strong>Step 5:<\/strong>&nbsp;After verifying that all the details are correct, click on Apply. After that, you will receive your Application Number \u2013 save that for future reference.<\/p>\n\n\n\n<p><strong>Step 6:<\/strong>&nbsp;Next, you will need to pay Rs. 1000 through online payment modes. Click on Pay Now, and you will be redirected to the payment page.<\/p>\n\n\n\n<p><strong>Step 7:<\/strong>&nbsp;After a successful payment, click on \u2018Go to Home\u2019, where you can track your application status. Keep checking from time to time, as it takes time for the status to change from Pending to Success\/Complete.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Conclusion<\/h2>\n\n\n\n<p>The Indian government has set a mighty target of 40GW for residential solar installation. Subsidizing\u00a0solar system prices in Haryana\u00a0and everywhere in India is an incredible step towards encouraging more and more households to yield the power of the sun. We hope the above details on the\u00a0solar panel price in Haryana\u00a0and the steps to apply for a subsidy will simplify your solar transition journey. So, if you haven\u2019t invested in a solar system yet, now is the right time to make the switch to a cleaner and greener power-generating system.<\/p>\n\n\n\n<p><strong>FAQs<\/strong>&nbsp;<\/p>\n\n\n\n<div class=\"wp-block-group ewd-ufaq-pattern-faqs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<div class=\"wp-block-gutena-accordion gutena-accordion-block gutena-accordion-block-9ed59e-fc is-layout-flow wp-block-accordion-is-layout-flow\" data-single=\"true\">\n<div class=\"wp-block-gutena-accordion-panel gutena-accordion-block__panel\">\n<div class=\"wp-block-gutena-accordion-panel-title gutena-accordion-block__panel-title\"><div class=\"gutena-accordion-block__panel-title-inner\">\n<h6 class=\"wp-block-heading has-text-align-left\" style=\"margin-top:0px;margin-right:0px;margin-bottom:0px;margin-left:0px\"><strong>Am I eligible for solar subsidy in Haryana?<\/strong><\/h6>\n<div class=\"trigger-up-down\"><div class=\"horizontal\"><\/div><div class=\"vertical\"><\/div><\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-gutena-accordion-panel-content gutena-accordion-block__panel-content\"><div class=\"gutena-accordion-block__panel-content-inner\">\n<p style=\"margin-top:0;margin-bottom:0\">Under the simplified procedure, the National Portal for Rooftop Solar welcomes customers from all states of India to avail subsidy aid on grid-tied solar systems. The eligibility criteria and the CFA\/ subsidy structure remains the same for all Indian consumers.<\/p>\n<\/div><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-gutena-accordion-panel gutena-accordion-block__panel\">\n<div class=\"wp-block-gutena-accordion-panel-title gutena-accordion-block__panel-title\"><div class=\"gutena-accordion-block__panel-title-inner\">\n<h6 class=\"wp-block-heading has-text-align-left\" style=\"margin-top:0px;margin-right:0px;margin-bottom:0px;margin-left:0px\"><strong>What are the drawbacks of solar panel systems?<\/strong><\/h6>\n<div class=\"trigger-up-down\"><div class=\"horizontal\"><\/div><div class=\"vertical\"><\/div><\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-gutena-accordion-panel-content gutena-accordion-block__panel-content\"><div class=\"gutena-accordion-block__panel-content-inner\">\n<p style=\"margin-top:0;margin-bottom:0\">Solar systems don\u2019t produce electricity at night and give a low energy output on days when there is not enough sunshine. To be able to use power during these off-hours, you will need to add batteries to your solar system to store electricity for later use. This further increases your upfront\u00a05kW solar panel price in Haryana. However, solar systems that include batteries are not eligible under the national subsidy scheme.<\/p>\n<\/div><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-gutena-accordion-panel gutena-accordion-block__panel\">\n<div class=\"wp-block-gutena-accordion-panel-title gutena-accordion-block__panel-title\"><div class=\"gutena-accordion-block__panel-title-inner\">\n<h6 class=\"wp-block-heading has-text-align-left\" style=\"margin-top:0px;margin-right:0px;margin-bottom:0px;margin-left:0px\"><strong>How much kW of solar electricity do I need for a family of 3-4 members?<\/strong><\/h6>\n<div class=\"trigger-up-down\"><div class=\"horizontal\"><\/div><div class=\"vertical\"><\/div><\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-gutena-accordion-panel-content gutena-accordion-block__panel-content\"><div class=\"gutena-accordion-block__panel-content-inner\">\n<p style=\"margin-top:0;margin-bottom:0\">An average Indian household of three or four people may require 2.5-3kW of solar system. However, it depends on the power usage and the number of household appliances running on a day-to-day basis. You can avail\u00a0solar subsidy in Haryana\u00a0on both small and much larger system sizes.<\/p>\n<\/div><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-gutena-accordion-panel gutena-accordion-block__panel\">\n<div class=\"wp-block-gutena-accordion-panel-title gutena-accordion-block__panel-title\"><div class=\"gutena-accordion-block__panel-title-inner\">\n<h6 class=\"wp-block-heading has-text-align-left\" style=\"margin-top:0px;margin-right:0px;margin-bottom:0px;margin-left:0px\"><strong>What are the factors affecting solar generation?<\/strong><\/h6>\n<div class=\"trigger-up-down\"><div class=\"horizontal\"><\/div><div class=\"vertical\"><\/div><\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-gutena-accordion-panel-content gutena-accordion-block__panel-content\"><div class=\"gutena-accordion-block__panel-content-inner\">\n<p>Your solar energy generation depends on several factors such as:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Solar plant location<\/li>\n\n\n\n<li>Number of sunshine hours<\/li>\n\n\n\n<li>The quality of components or equipment used<\/li>\n\n\n\n<li>Workmanship<\/li>\n\n\n\n<li>Module cleaning<\/li>\n\n\n\n<li>Tilt angle and orientation of PV (photovoltaic) module<\/li>\n\n\n\n<li>Operation and Maintenance (O&amp;M) and monitoring activities, and so on.<\/li>\n<\/ul>\n<\/div><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-gutena-accordion-panel gutena-accordion-block__panel\">\n<div class=\"wp-block-gutena-accordion-panel-title gutena-accordion-block__panel-title\"><div class=\"gutena-accordion-block__panel-title-inner\">\n<h6 class=\"wp-block-heading has-text-align-left\" style=\"margin-top:0px;margin-right:0px;margin-bottom:0px;margin-left:0px\"><strong>Will I receive the same annual energy for 25 years?<\/strong><\/h6>\n<div class=\"trigger-up-down\"><div class=\"horizontal\"><\/div><div class=\"vertical\"><\/div><\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-gutena-accordion-panel-content gutena-accordion-block__panel-content\"><div class=\"gutena-accordion-block__panel-content-inner\">\n<p style=\"margin-top:0;margin-bottom:0\">No, the annual output may vary year-on-year, depending on factors like sunlight exposure, climatic conditions, and degradation of solar generation (which happens with time). Consumers using solar energy see a dramatic fall in their monthly electricity bills. These savings over the span of 6-8 years can pay off your initial\u00a0solar system price in Haryana.<\/p>\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-gutena-accordion gutena-accordion-block gutena-accordion-block-3338a6-8b is-layout-flow wp-block-accordion-is-layout-flow\" data-single=\"true\"><\/div>\n","protected":false},"excerpt":{"rendered":"<p>To save natural resources and the climate, Solar Photovoltaic Technology is gaining momentum as a powerful alternative for generating electricity. Solar energy plants provide a reliable supply of zero-cost electricity for a span of 25 years. It\u2019s a viable solution for the commercial and industrial sectors as well as individual households and housing societies. Solar [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":906,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[1],"tags":[4,5,6,7,8,9,10],"class_list":["post-250","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","tag-10-solar-companies","tag-advantages-of-solar-power","tag-africa","tag-amplus","tag-amplus-solar","tag-amplus-solar-output","tag-asset-management"],"_links":{"self":[{"href":"https:\/\/www.cnvrs8.com\/demo\/amplussolar\/blog\/wp-json\/wp\/v2\/posts\/250"}],"collection":[{"href":"https:\/\/www.cnvrs8.com\/demo\/amplussolar\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cnvrs8.com\/demo\/amplussolar\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cnvrs8.com\/demo\/amplussolar\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cnvrs8.com\/demo\/amplussolar\/blog\/wp-json\/wp\/v2\/comments?post=250"}],"version-history":[{"count":1,"href":"https:\/\/www.cnvrs8.com\/demo\/amplussolar\/blog\/wp-json\/wp\/v2\/posts\/250\/revisions"}],"predecessor-version":[{"id":252,"href":"https:\/\/www.cnvrs8.com\/demo\/amplussolar\/blog\/wp-json\/wp\/v2\/posts\/250\/revisions\/252"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cnvrs8.com\/demo\/amplussolar\/blog\/wp-json\/wp\/v2\/media\/906"}],"wp:attachment":[{"href":"https:\/\/www.cnvrs8.com\/demo\/amplussolar\/blog\/wp-json\/wp\/v2\/media?parent=250"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cnvrs8.com\/demo\/amplussolar\/blog\/wp-json\/wp\/v2\/categories?post=250"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cnvrs8.com\/demo\/amplussolar\/blog\/wp-json\/wp\/v2\/tags?post=250"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}